Why trust a young company with your compliance data? Fair question.

The founding insight

Every ton that leaves an Indian plant crosses a weighbridge. Every kilowatt is metered. The data CBAM demands already exists at the gate — it just dies in retyped spreadsheets. Ferrologic Analytics exists because the honest number is already being measured; someone had to refuse to let it be typed over.

The methodology

Scope 1 & 2 emissions per ton of metal, computed from calibrated instruments, not estimates. Readings carry an OIML R-76 calibration lock from the scale to the report, with a traceable path a verifier can follow.

That matters because verified data faces a 5% materiality threshold (IR (EU) 2025/2546) — a number built from locked measurements can defend itself; a retyped spreadsheet cannot.

Who we build for

Secondary steel smelters and aluminium extrusion plants in India that export to the EU. Not every factory — this one kind, deeply: the weighbridge, the furnace power draw, the HSN codes on the invoice (7308, 7318, 7604), the buyer in Milan asking for numbers by Friday.

SAID PLAINLY

Where we are

We are pre-pilot. The platform is built and running; no plant is in production deployment yet, and we will not pretend otherwise. What we offer today is the architecture, shown honestly: how capture works, how the calculation holds up, how the export is shaped. If it convinces you, you become the operating proof — on terms that reflect being first.

See the architecture. Judge it yourself.

Fifteen minutes, one screen share, no operational claims — the software and how it connects.

Request a 15-Minute Technical Architecture Demo